340+
Project Complete
About Us
Welcome to Linadapter
Whether securing a new roof to a station building, adding new digital displays to station platforms or fixing low speed rails within a depot, Lindapter has a proven accredited solution.
Established in 1934, Lindapter International is the world’s innovator of steelwork clamping systems, eliminating the need to drill or weld steel on-site.
Lindapter connections can be temporary or permanent, adjusted on-site and do not damage steelwork; ideal for installing station building services that may need to be realigned or removed or for attaching a new roof to a listed station building.
Why Use Lindapter Connections in the Rail Industry
Lindapter is a world leader in the design and manufacture of steel-to-steel connections that eliminate the need for on-site drilling or welding. The concept allows a safer, faster installation and less work at height compared to traditional methods, which significantly reduces costs.
Faster installation
Lower labour costs
Durable
High strength connections
Reliable
Independently approved
No steelwork damage
No site drilling or welding
Easy to install & adjust
Accurate positioning
Hassle-free solutions
Free detailing service
Our Product
A Wide range Of Our Product
Station Buildings
Lindapter’s versatile clamping systems offer a wide range of temporary and permanent applications in railway station buildings around the world.
Read MoreStation Fittings
Railway stations feature a wide range of fittings that must be secured to a station building’s steelwork.
Read MoreElectrification
Lindapter connections offer cost effective and easy to install solutions for railway line electrification.
Read MoreRail Bridges
Lindapter product are ideally suited for use in the construction of new rail bridges and the strengthening and refurbishment of existing ones.
Read MoreDepots
Lindapter clamps and fixings provide a range of opportunities to save time and money on steelwork connections in train depots.
Read MoreAccess Walkways
Access walkway is fitted throughout rail networks, in station buildings, depots and alongside railway lines.
Read MoreProject Experience
The purpose and goals of the project
-
1986
year Established
-
5.016
Project completed
-
365 M
Square Footage poured
-
2250
Awards earned
Our Blog
Our Latest News
-
02 Commet
Integrating energy-efficient designs not only lowers.
Emphasize the skill, experience, and qualifications of your architects, builders, and contractors
Read More-
02 Commet
Construction projects often generate a significant.
Emphasize the skill, experience, and qualifications of your architects, builders, and contractors
Read More-
02 Commet
The choice of building materials plays a pivotal role.
Emphasize the skill, experience, and qualifications of your architects, builders, and contractors
Read More